Affichage des articles dont le libellé est USA. Afficher tous les articles
Affichage des articles dont le libellé est USA. Afficher tous les articles

High speed trains : the new californian dream for next decade

Analysis of Mediarail.be - Signalling technician and railways observer
(version française disponible à ce lien)
More news, in english en french, on the facebook page of Mediarail.be
20/01/2015


After many years of controversy and skepticism about the California's bullet train, the state is finally ready to break ground on the San Francisco-to-Los Angeles rail line. What’s really happens in America, the country where high speed line was just a toy for old Europe ?  Analysis.



As this told  in the website Contra Costatimes.com Larry Gerston, a political expert at San Jose State University: “before, you never knew if and when the project would really get going. Now, as those tracks get laid, mile by mile, it gets harder and harder to turn back the idea.” And so took place last January in Fresno, a ceremony which will be a etching in the pages of railway history. That was the day, California began one of the largest infrastructure projects of his history, a massive high-speed rail line that would connect San Francisco to Los Angeles. The dream comes true ? It's depends. Dream for some people, a nightmare for others.

Fresno (photo from Department of Transport)

Fresno Mayor Ashley Swearengin, a Republican, said she backs the rail system. In addition to putting construction workers on the job in the short term, Swearengin said the rail project will connect the Central Valley agricultural region with other sectors of the state's economy. Californian Governor, Jerry Brown (D), 76 years old, who is in his fourth term, told to Washington Post last year : « we should be able to have at least one high-speed rail, and the only place that’s going to happen in our lifetime is California ». As everyone know, California is really a Earth of the future. The rail project is estimated to cost $68 billion over the next 14 years, and the inaugurated section account only 29 miles. Phase one of the project is planned to run from Merced to Bakerfield in 2018, as shown the map bellow :



The entire project will reach the north of Los Angeles in 2028, in Burbank. the next stage of the passage through the city of angels, to Anaheim, is uncertain however. One again a tunnel, like the famous Alameda corridor ? The system will run from San Francisco to the Los Angeles basin in under three hours at speeds capable of over 200 miles per hour (320 km/h). The 836 kilometers of line will account 24 new stations.

History
Plans for a high-speed train system linking Northern and Southern California were proposed by Governor Jerry Brown in the 1980s, the same governor that today ! In 2008, voters approved by referendum the issuing of bonds with 52.7% voting in favor, the called Proposition 1A (the ‘Safe, Reliable, High Speed Passenger Trains Bond Act for the 21st Century').From this date, things began to mature. The project is however not without controversy. Local governments and opponents critical of the rail system’s cost and legality have sued to block the project several times. Those suits, along with slower-than-expected land acquisition, have set back the beginning of construction by two years. The California Supreme Court still ruled in October against a suit brought by Kings County that would have blocked construction.

Who is responsible ?
The project’s governing body is the California High-Speed Rail Authority (CHSRA), created in 1996, and responsible for planning, designing, building and operation of the first high-speed rail system in the nation and which is working with regional partners to implement a state-wide rail modernization plan that will invest billions of dollars in local and regional rail lines to meet the state’s 21st century transportation needs. 

A big financial challenge
In 2008, the cost of the initial San Francisco-to-Anaheim segment was originally estimated by the Authority to be $33 billion. But after many years, the estimated spending grew up to to $53.4 billion in 2011 and finally reached $68.4 billion. Last price ? Surely not ! With this kind of project, the actualized spending will not still reflect the reality. It will be sufficient to refer to the Eurotunnel project or of many high speed lines in Europe, when it is becoming taken for granted that the high speed ecosystem becomes a deficit machine, like in France.

In the Anglo-American world, taxpayers' money is a issue which enrages many people, many more than outside in the world. People don't hesitate to say that after the Obama Administration’s unaccountable spending in the early years of his presidency, the American people spoke loudly and ushered in a new Republican Congress to stop the waste. How, therefore, California authority can do to justify a spending of 68 billion dollars over 14 years ?

The first approval in 2008 by voters was a issuing of bonds for $9.95 billion. The Obama administration added another $3.2 billion in federal grants, and the legislature agreed in 2014 to provide funding through cap-and-trade taxes on greenhouse gases, which will add another $250 million to $1 billion per year, what makes us a total for only $26 billion at best. California High-Speed Rail Authority officials have said they expect advertising, real estate developments and private investors to fund up to a third of the total costs. Over the past six months, the authority scored a major legal victory that will allow the state to sell more than $8 billion in bonds and won its first steady stream of state funding from a program that collects fees from California's worst polluters.



Works began
Before the ceremony of Fresno, CHSRA has selected in april 2013 an offer of $985millions by the consortium of Tutor Perini Corp, Zachry Construction Corp and Parsons Corp to undertake civil works on the first 47 km section, from Madera to Fresno in the Central Valley. This  time, things have really started.

Rolling stock
The question of rolling stock is widely anticipated. In October 2014, according International Railway Journal, California High Speed Rail Authority had received 10 responses to its request for expressions of interest in a contract to supply trainsets and a maintenance facility. The manufacturers are :
Alstom Transportation;
AnsaldoBreda;
Bombardier Transit Corp;
CSR Corp;
Hyundai Rotem;
Marnell Transportation;
Kawasaki Rail Car;
Siemens Industry;
SunGroup USA & World Harmony City/CNR Tangshan Railway Vehicle Co;
Talgo.

The Authority anticipates that the final design would be a single-deck EMU capable of revenue operation at speeds up to 354 km/h (220 mile/h). A maximum train length of 205 m is specified, with a minimum of 450 seats in first and business classes with seat pitches of 1 067 mm and 991 mm respectively. Static axleloads should not exceed 17 tonnes, in line with the European high speed Technical Specification for Interoperability issued in 2008, CHSRA said. With a fleet of up to 95 trainsets, it is clear that a great battle begins…

So there's an enthralling project to follow on the next ten years. If we add to that the HS2 project in England (1), we have two projects of new railways infrastructure in the Anglo-American world, with his unique attributes for financing. We are very keen to find out how that goes…



The U.S. : a little trip in another railway world

Analysis of Mediarail.be - Signalling technician and railways observer


Over the last 30 years, the American rail freight industry has witnessed an increase in its modal share, productivity, and profitability. There are some reasons to compare railways in the U.S with Europe, but they are no reasons to reproduce the recipe in the Continent. A brief overview of another world.

(photo Ravensong 75 via Flickr CC BY 2.0)
Economy
Railways boost the national economy, that’s evidence. As Ed Hamberger, AAR president/CEO detailed in 2010: « 70% of new automobiles make their first trip off the assembly line by train. Most of the coal that provides about half of the nation’s electricity moves by rail ». Data shown that coal accounts for about 29% of the ton-miles of surface modes and around 44% of the ton-miles moved by rail, while in Europe, it is less than 3% of the surface modes and around 13% for rail. Globally, in 2009, the rail share of the modal split based on t/km, was 36.8% in the U.S. to compare to only 9.9% in EU. Intermodal trains shipped 10 million units for the first time since 2003.

A brief history
Rail deregulation (the Staggers Act of 1980) changed railroads from being one of the most regulated industries in the United States to a market-oriented system. The Staggers Act relaxed controls on rates, allowed railroads to contract to provide specific services to individual firms, to enter into long-term contracts, and made mergers between railroads and the abandonment of non-profitable branch lines easier. The number of smaller railroads has increased from 212 in 1980 to 550 in 1994. Today, ca 600 railroads operate common carrier freight service in the United States, classified into five groups, on 220.000km of railways lines. There are seven Class I railroads ranging in size from just over 3,000 to more than 33,000 miles operated and from 2,600 to more than 46,000 employees.



Infrastructure
The U.S. railways finance their infrastructure investments on their own. This applies both to the rail network and intermodal terminals. However the public authorities consider certain rail-related investments necessary to ensuring their policy objectives such as reduction of environmental pollution, improved transport safety, relief of congested highways, and promotion of regional development, ports and the domestic economy. Example with Alameda corridor (Los Angeles), the Chicago City project or the Patriot corridor (NS).
Whereas in Europe the capabilities of the rail infrastructure network – maximum train weight and length, axle loads, and clearance gauge – are a particularly critical factor in determining a production system due to the severe restrictions and extreme diversity of characteristics encountered throughout Europe, in North America by contrast, railways hardly have to cope with infrastructure constraints at all, managed with only one language…

Business & track access
Freight railways in the U.S. provide for their own, private rail network. Since, in Europe, networks are state-owned public infrastructure network managers are subject to EU and national regulation. Even though US Class I railways operate large networks, they simply could not adequately reach some customers or markets if they had to rely solely on their own tracks. They can extend their geographical scope through interchange agreements with other railways. In this case, if they seek to supply services to locations off their network they can often rely on trackage rights – the right to operate on foreign rail lines by own locos and staff – or haulage rights – the opportunity to subcontract traction service to foreign railway. That made a radical difference with Europe where each national networks plays alone. The European Commission has designed three legislative packages during 20 years to come up with something that looks like trackage rights, which permits them to ensure a non-discriminatory access for every authorised user. And there are still nevertheless quite political resistance ...

(photo J-P Mueller 99 via Flickr CC BY 2.0)
In practice
Where trainload services are concerned, the regulations applicable in USA are as follows :
- Trackage rights: These rights allow a railway to operate on the lines of another railway by employing its own locomotives and staff. In the (fictitious) example given below, Union Pacific (UP) had trackage rights for the New Orleans-Memphis line of Norfolk Southern (NS) and would be permitted to continue with its own resources all the way to the NS Memphis intermodal terminal.
- Haulage right: This right entitles a railway to carry out rail services on the lines of another railway but must subcontract operations to this company. Our example shows that if UP had no trackage rights for the CSX line to Memphis, UP would have been obliged to have its train operated by CSX locomotives and staff.

The interchange procedures between U.S. railways, by subcontract operations are rather vulnerable to coordination deficits, meaning that the railway taking over a train from another does not always deploy the necessary resources on time. This results in irregularities and delays. For this reason U.S. railways clearly prefer to maintain control of their own trains.

The business model
The liberalization of the rail freight industry in Europe trying to make it possible an “all-inclusive” intermodal business model such as in North America. But even when European railways were integrated companies the business models were much more complex than in North America and essentially centred around a new category of logistic service provider, the intermodal operator.

What is typical for operator-driven “open” block-train services is that intermodal service providers in Europe do not require their customers to enter into a contractual obligation to ship a certain number of units by each service if the capacities employed result more or less from the day-to-day decisions of customers.

The fairly homogeneous business models much more reflect a mentality of many American enterprises. They wish to keep their business simple and understandable for their customers. As say the company BNSF: « Create intermodal rail service for our customers that is easy to understand and use: simple network and simple network offerings ».

A recipe : the full business control
The American railways emphasize that it is crucial for them to control the entire port-to door chain. This enables them to manage the flow of containers on a trade lane so that a regularly high train capacity load factor can be accomplished and resources employed efficiently. To ensure efficient services for example they use « slow » containers (overseas), which are conveying commodities to be delivered within a long time-span, as a buffer-stock to complete trains.

Productivity
In US, the rail wagon  is viewed rather as a “commodity” and not as a piece of competition. The loading units shipped by intermodal services are standardised and comparatively homogeneous particularly in terms of equipment. The maximum permitted axle-load of wagons is about 31.8 metric tonnes – against 22.5 tonnes in Europe. The majority of marine and domestic containers are moved on double-stack trains.

(photo Michael Kappel via Flickr CC BY NC_2.0)
The typical loading capacity of U.S. trains and an average gross weight of 8.3 tonnes per TEU (Twenty Equivalent Unit), the gross weight would amount to 2,000 to 5,000 tonnes. While 1340m (750m maxi in Europe) long trains are somewhat the standard in U.S. east coast traffi c, intermodal trains serving the west of the country are usually 1830 to 2440m foot long.

For 1000 tons, the U.S. Class I railroads require 0,28 trains and 1,94 in Europe. That means that the operational revenues per ton-mile are higher in Europe, almost two times more than in the U.S. This is explained by the smaller length of trains which requires more traffic and more line capacity than U.S. The American ratio weight/length combined with longer shipment distances contribute to a higher productivity. Despite the fully use of diesel, the prices of fuel is only the half of Europe, encouraging the non-electrification of tracks. In addition, interoperability barriers in the EU28 are of course nonexistent in the U.S., such as different gauges, signalling systems, and electric systems.

Regular schedules in the U.S. mean that intermodal services are operated five to seven days a week. Some examples :
Los Angeles-Chicago : 3409km, 59 hours, average speed of 58km/h. For its Premium Service level BNSF also offers a 100% on-time guarantee currently on 26 O/D links. This confirms the use of trackage rights mentioned above and the absolute control of the entire production chain, included terminals.

Other example with Norfolk Southern and Union Pacific, which have joined forces to enable transcontinental domestic services for trailers and containers under the brand “Blue Streak”. Services are operated over the networks of the two railways as interline traffic. This product comprises of four service levels.

In fact
It is not easy to compare two different worlds: Europe is a "technical railway mosaic" while American railways were designed in only one technical environment. The failure of the U.S. concept is the massive use of fossil energy and the minimal maintenance of the infrastructure, causing serious derailments as we saw recently in Quebec. But we can learn the lesson plan is to obtain rights internetwork by passing simple contracts and the need to control the entire production model, rather than cooperation which adds the handicaps of each.

 (1) The maritime sector requires the opposite: contracts are signed for an annual quantity, sometimes six months.